Bohn, J S and Teizer, J (2010) Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras. Journal of Construction Engineering and Management, 136(06), 632–40.

Chua, D K H, Yeoh, K W and Song, Y (2010) Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design. Journal of Construction Engineering and Management, 136(06), 641–9.

Geem, Z W (2010) Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search. Journal of Construction Engineering and Management, 136(06), 711–6.

  • Type: Journal Article
  • Keywords: Project management; Scheduling; Critical path method; Optimization; Costs; Project scheduling; Critical path method; Time-cost trade-off problem; Combinatorial optimization; Harmony search;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000167
  • Abstract:
    Completing a project with minimal time as well as minimal cost is a critical factor for scheduling a project. However, because completion speed tends to be correlated with cost (e.g., usually, time can be saved if more workers are hired), the relationship between time and cost is a trade-off. This study employed a phenomenon-mimicking algorithm, harmony search to perform this biobjective trade-off. The harmony search algorithm was applied to two test examples, and good Pareto solutions were obtained when compared with other algorithms, such as the genetic algorithm and the ant colony optimization algorithm. The harmony search algorithm explored only a small amount of total solution space in order to solve this combinatorial optimization problem. The model in this study has obtained good results with a network of up to 18 nodes, however it is anticipated that the model could be useful to solve bigger networks in practice without any difficult problem.

Love, P E D, Edwards, D J and Irani, Z (2010) Work Stress, Support, and Mental Health in Construction. Journal of Construction Engineering and Management, 136(06), 650–8.

Marzouk, M, Abdallah, M and El-Said, M (2010) Modeling Microtunneling Projects using Computer Simulation. Journal of Construction Engineering and Management, 136(06), 670–82.

Park, M, Lee, M, Lee, H and Hwang, S (2010) Boost, Control, or Both of Korean Housing Market: 831 Countermeasures. Journal of Construction Engineering and Management, 136(06), 693–701.

Sacks, R and Partouche, R (2010) Empire State Building Project: Archetype of “Mass Construction”. Journal of Construction Engineering and Management, 136(06), 702–10.

Sarkar, D and Dutta, G (2010) Design and Application of Risk Adjusted Cumulative Sum for Strength Monitoring of Ready Mixed Concrete. Journal of Construction Engineering and Management, 136(06), 623–31.

Sugimoto, M and Asanprakit, A (2010) Stack Pipe Model for Pipe Jacking Method. Journal of Construction Engineering and Management, 136(06), 683–92.

Zhao, Z Y, Lv, Q L, Zuo, J and Zillante, G (2010) Prediction System for Change Management in Construction Project. Journal of Construction Engineering and Management, 136(06), 659–69.